PMI PMP Practice Test 10

Question 90

A predictive project delivery setting is used, with formal milestones and baseline control. The project situation is: A project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime. A readiness review shows the current management approach is ineffective. Which corrective action BEST resolves the exact gap?

  1. Corrective action: Adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations
  2. Corrective action: Discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs
  3. Corrective action: Publicly compare the analyst to less productive colleagues in a reprimand
  4. Corrective action: Establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting

Explanation

Correct Answer

B:

To correct the failure where a project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime, discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs. The team can validate the repair by arranging to inspect adjusted workload and subsequent performance and team feedback.

Incorrect Answers

A:

Changing the system to adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations would not reverse the specified failure: a project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime. The corrective change is to discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs.

C:

Publicly compare the analyst to less productive colleagues in a reprimand retains the error identified in the incident; it is not a repair. The appropriate corrective action is to discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs.

D:

Changing the system to establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting would not reverse the specified failure: a project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime. The corrective change is to discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs.

Question 91

A predictive project delivery setting is used, with formal milestones and baseline control. The project situation is: A project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime. Which pre-release planning or approval gate would BEST avoid this problem and preserve necessary governance?

  1. Approval gate: Publicly compare the analyst to less productive colleagues in a reprimand
  2. Approval gate: Adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations
  3. Approval gate: Establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting
  4. Approval gate: Discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs

Explanation

Correct Answer

D:

Approval gate: Discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs. The gate requires this specific check again after later changes, rather than relying on a one-time approval.

Incorrect Answers

A:

Approval gate: Publicly compare the analyst to less productive colleagues in a reprimand does not make future changes demonstrate the required result for the reported case: a project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime. The relevant gate is to approval gate: Discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs.

B:

Approval gate: Adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations does not make future changes demonstrate the required result for the reported case: a project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime. The relevant gate is to approval gate: Discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs.

C:

Approval gate: Establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting does not make future changes demonstrate the required result for the reported case: a project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime. The relevant gate is to approval gate: Discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs.

Question 92

A predictive project delivery setting is used, with formal milestones and baseline control. The project situation is: A project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime. Select TWO complementary records: the appropriate management decision and the observed acceptance result that demonstrates it was effective. Which TWO are required?

  1. Approved decision: Discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs
  2. Observed result: Compare risk discovery lead times and candid retrospective participation after the change
  3. Observed result: Inspect adjusted workload and subsequent performance and team feedback
  4. Observed result: Gather evidence of understanding and delivery autonomy across differently experienced team members
  5. Observed result: Verify integrated acceptance outcomes and inspect cross-team dependency resolutions

Explanation

Correct Answers

A:

This is the required control or corrective action: discuss workload and motivation privately, rebalance assignments, and provide constructive recognition consistent with team needs. It complements the observed test to inspect adjusted workload and subsequent performance and team feedback.

C:

Inspect adjusted workload and subsequent performance and team feedback. That observation tests whether the response works for the actual condition: a project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime.

Incorrect Answers

B:

The proposed evidence—compare risk discovery lead times and candid retrospective participation after the change—checks a different result rather than the one established by this case: a project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime. The aligned check is to inspect adjusted workload and subsequent performance and team feedback.

D:

The proposed evidence—gather evidence of understanding and delivery autonomy across differently experienced team members—checks a different result rather than the one established by this case: a project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime. The aligned check is to inspect adjusted workload and subsequent performance and team feedback.

E:

The proposed evidence—verify integrated acceptance outcomes and inspect cross-team dependency resolutions—checks a different result rather than the one established by this case: a project manager notices a high-performing analyst has disengaged after repeated unrecognized overtime. The aligned check is to inspect adjusted workload and subsequent performance and team feedback.

Question 93

A predictive project delivery setting is used, with formal milestones and baseline control. The project situation is: A cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. What is the BEST next project management decision to achieve the intended result while retaining accountable stakeholder ownership?

  1. Replace participatory design sessions with one-way instructions for everyone
  2. Establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting
  3. Establish cross-team objectives and dependency ownership with facilitation rather than micromanagement
  4. Adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations

Explanation

Correct Answer

D:

Because a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts, adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations. A suitable check is to gather evidence of understanding and delivery autonomy across differently experienced team members.

Incorrect Answers

A:

Replace participatory design sessions with one-way instructions for everyone is precisely the unsafe assumption that the design needs to avoid when a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The proposed control is to adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations.

B:

Establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting would not satisfy the actual requirement: a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The implementation must instead adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations.

C:

Establish cross-team objectives and dependency ownership with facilitation rather than micromanagement would not satisfy the actual requirement: a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The implementation must instead adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations.

Question 94

A predictive project delivery setting is used, with formal milestones and baseline control. The project situation is: A cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. Which mistaken management shortcut MOST directly explains the risk or failed outcome in this situation?

  1. Replace participatory design sessions with one-way instructions for everyone
  2. Reward each team only for its private velocity regardless of product integration
  3. Publish a ranking of individuals responsible for each inaccurate estimate
  4. Remove the member from critical discussions on the assumption that accommodations are disruptive

Explanation

Correct Answer

A:

The flawed assumption is to replace participatory design sessions with one-way instructions for everyone; that decision does not account for the condition that a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The corresponding control is to adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations.

Incorrect Answers

B:

Reward each team only for its private velocity regardless of product integration is not the particular mistake underlying the evidence that a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The relevant flawed assumption is to replace participatory design sessions with one-way instructions for everyone.

C:

Publish a ranking of individuals responsible for each inaccurate estimate is not the particular mistake underlying the evidence that a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The relevant flawed assumption is to replace participatory design sessions with one-way instructions for everyone.

D:

Remove the member from critical discussions on the assumption that accommodations are disruptive is not the particular mistake underlying the evidence that a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The relevant flawed assumption is to replace participatory design sessions with one-way instructions for everyone.

Question 95

A predictive project delivery setting is used, with formal milestones and baseline control. The project situation is: A cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. A readiness review shows the current management approach is ineffective. Which corrective action BEST resolves the exact gap?

  1. Corrective action: Replace participatory design sessions with one-way instructions for everyone
  2. Corrective action: Establish cross-team objectives and dependency ownership with facilitation rather than micromanagement
  3. Corrective action: Establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting
  4. Corrective action: Adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations

Explanation

Correct Answer

D:

To correct the failure where a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts, adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations. The team can validate the repair by arranging to gather evidence of understanding and delivery autonomy across differently experienced team members.

Incorrect Answers

A:

Replace participatory design sessions with one-way instructions for everyone retains the error identified in the incident; it is not a repair. The appropriate corrective action is to adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations.

B:

Changing the system to establish cross-team objectives and dependency ownership with facilitation rather than micromanagement would not reverse the specified failure: a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The corrective change is to adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations.

C:

Changing the system to establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting would not reverse the specified failure: a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The corrective change is to adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations.

Question 96

A predictive project delivery setting is used, with formal milestones and baseline control. The project situation is: A cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. Which pre-release planning or approval gate would BEST avoid this problem and preserve necessary governance?

  1. Approval gate: Adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations
  2. Approval gate: Replace participatory design sessions with one-way instructions for everyone
  3. Approval gate: Establish cross-team objectives and dependency ownership with facilitation rather than micromanagement
  4. Approval gate: Establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting

Explanation

Correct Answer

A:

Approval gate: Adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations. The gate requires this specific check again after later changes, rather than relying on a one-time approval.

Incorrect Answers

B:

Approval gate: Replace participatory design sessions with one-way instructions for everyone does not make future changes demonstrate the required result for the reported case: a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The relevant gate is to approval gate: Adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations.

C:

Approval gate: Establish cross-team objectives and dependency ownership with facilitation rather than micromanagement does not make future changes demonstrate the required result for the reported case: a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The relevant gate is to approval gate: Adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations.

D:

Approval gate: Establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting does not make future changes demonstrate the required result for the reported case: a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The relevant gate is to approval gate: Adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations.

Question 97

A predictive project delivery setting is used, with formal milestones and baseline control. The project situation is: A cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. Select TWO complementary records: the appropriate management decision and the observed acceptance result that demonstrates it was effective. Which TWO are required?

  1. Approved decision: Adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations
  2. Observed result: Compare risk discovery lead times and candid retrospective participation after the change
  3. Observed result: Verify integrated acceptance outcomes and inspect cross-team dependency resolutions
  4. Observed result: Gather evidence of understanding and delivery autonomy across differently experienced team members
  5. Observed result: Confirm accessible participation and examine whether decisions include the required expertise

Explanation

Correct Answers

A:

This is the required control or corrective action: adapt leadership style and coaching to team readiness while maintaining consistent ethical expectations. It complements the observed test to gather evidence of understanding and delivery autonomy across differently experienced team members.

D:

Gather evidence of understanding and delivery autonomy across differently experienced team members. That observation tests whether the response works for the actual condition: a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts.

Incorrect Answers

B:

The proposed evidence—compare risk discovery lead times and candid retrospective participation after the change—checks a different result rather than the one established by this case: a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The aligned check is to gather evidence of understanding and delivery autonomy across differently experienced team members.

C:

The proposed evidence—verify integrated acceptance outcomes and inspect cross-team dependency resolutions—checks a different result rather than the one established by this case: a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The aligned check is to gather evidence of understanding and delivery autonomy across differently experienced team members.

E:

The proposed evidence—confirm accessible participation and examine whether decisions include the required expertise—checks a different result rather than the one established by this case: a cross-cultural project is struggling because a manager insists the same directive style for experienced architects and novice analysts. The aligned check is to gather evidence of understanding and delivery autonomy across differently experienced team members.

Question 98

An adaptive/agile project delivery setting is used, with iterative feedback and product prioritization. The project situation is: A team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. What is the BEST next project management decision to achieve the intended result while retaining accountable stakeholder ownership?

  1. Adjust collaboration practices and tools inclusively while preserving clear contribution and delivery expectations
  2. Establish cross-team objectives and dependency ownership with facilitation rather than micromanagement
  3. Establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting
  4. Publish a ranking of individuals responsible for each inaccurate estimate

Explanation

Correct Answer

C:

Because a team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings, establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting. A suitable check is to compare risk discovery lead times and candid retrospective participation after the change.

Incorrect Answers

A:

Adjust collaboration practices and tools inclusively while preserving clear contribution and delivery expectations would not satisfy the actual requirement: a team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. The implementation must instead establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting.

B:

Establish cross-team objectives and dependency ownership with facilitation rather than micromanagement would not satisfy the actual requirement: a team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. The implementation must instead establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting.

D:

Publish a ranking of individuals responsible for each inaccurate estimate is precisely the unsafe assumption that the design needs to avoid when a team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. The proposed control is to establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting.

Question 99

An adaptive/agile project delivery setting is used, with iterative feedback and product prioritization. The project situation is: A team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. Which mistaken management shortcut MOST directly explains the risk or failed outcome in this situation?

  1. Reward each team only for its private velocity regardless of product integration
  2. Require manager approval for all routine technical choices to signal leadership control
  3. Publish a ranking of individuals responsible for each inaccurate estimate
  4. Remove the member from critical discussions on the assumption that accommodations are disruptive

Explanation

Correct Answer

C:

The flawed assumption is to publish a ranking of individuals responsible for each inaccurate estimate; that decision does not account for the condition that a team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. The corresponding control is to establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting.

Incorrect Answers

A:

Reward each team only for its private velocity regardless of product integration is not the particular mistake underlying the evidence that a team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. The relevant flawed assumption is to publish a ranking of individuals responsible for each inaccurate estimate.

B:

Require manager approval for all routine technical choices to signal leadership control is not the particular mistake underlying the evidence that a team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. The relevant flawed assumption is to publish a ranking of individuals responsible for each inaccurate estimate.

D:

Remove the member from critical discussions on the assumption that accommodations are disruptive is not the particular mistake underlying the evidence that a team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. The relevant flawed assumption is to publish a ranking of individuals responsible for each inaccurate estimate.

Question 100

An adaptive/agile project delivery setting is used, with iterative feedback and product prioritization. The project situation is: A team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. A readiness review shows the current management approach is ineffective. Which corrective action BEST resolves the exact gap?

  1. Corrective action: Establish cross-team objectives and dependency ownership with facilitation rather than micromanagement
  2. Corrective action: Publish a ranking of individuals responsible for each inaccurate estimate
  3. Corrective action: Adjust collaboration practices and tools inclusively while preserving clear contribution and delivery expectations
  4. Corrective action: Establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting

Explanation

Correct Answer

D:

To correct the failure where a team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings, establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting. The team can validate the repair by arranging to compare risk discovery lead times and candid retrospective participation after the change.

Incorrect Answers

A:

Changing the system to establish cross-team objectives and dependency ownership with facilitation rather than micromanagement would not reverse the specified failure: a team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. The corrective change is to establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting.

B:

Publish a ranking of individuals responsible for each inaccurate estimate retains the error identified in the incident; it is not a repair. The appropriate corrective action is to establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting.

C:

Changing the system to adjust collaboration practices and tools inclusively while preserving clear contribution and delivery expectations would not reverse the specified failure: a team refuses to report estimation uncertainty because earlier mistakes led to blame at retrospective meetings. The corrective change is to establish psychological safety, clarify problem-solving norms, and invite evidence-backed early risk reporting.