Practice Exams:

Fortinet NSE5_FSW_AD-7.6 Dumps

EXAM: Fortinet NSE 5 - FortiSwitch 7.6 Administrator
Verified By Experts
Premium Bundle
$49.99

NSE5_FSW_AD-7.6 Premium ETE File


  • Premium File 64 Questions & Answers
Whats Included:
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates

Fortinet NSE5_FSW_AD-7.6 Practice Test 15

Question 140

An insurer wants active links to separate switch chassis but has not implemented the required supported multi-chassis design. Which action combined with its meaningful verification offers the most defensible resolution?

  1. For a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. Acceptance evidence: Test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.
  2. For a FortiLink-managed deployment, keep the agreed inter-VLAN security and gateway routing on the FortiGate unless an explicitly supported alternative routing topology is designed. Acceptance evidence: Check source and destination routes, firewall session path, gateway ARP owner and policy logs for one test client in each protected network.
  3. Configure the FortiGate FortiLink aggregate according to whether its physical members terminate on one FortiSwitch or a supported MCLAG peer group, validating split behavior separately. Acceptance evidence: Inspect FortiGate aggregate partner state, active-versus-standby paths and FortiSwitch management continuity before and after a staged link change.
  4. Select compatible supported transceiver types and cabling for the FortiSwitch platform, port mode, optic wavelength and expected fiber distance. Acceptance evidence: Inspect FortiSwitch interface and transceiver status, error counters and received signal levels before and after a supported test replacement.

Explanation

Correct Answer

C:

The situation is that an insurer wants active links to separate switch chassis but has not implemented the required supported multi-chassis design. Configure the FortiGate FortiLink aggregate according to whether its physical members terminate on one FortiSwitch or a supported MCLAG peer group, validating split behavior separately. Acceptance evidence: Inspect FortiGate aggregate partner state, active-versus-standby paths and FortiSwitch management continuity before and after a staged link change. This pairing is justified because an aggregate connected to unrelated peers is not automatically one consistent LACP partner and FortiLink split mode can intentionally leave only one path active.

Incorrect Answers

A:

This action and check address the distinct objective “Validate the MCLAG inter-chassis connection before dual-homing” instead of the stated acceptance requirement. The matching action is to configure the FortiGate FortiLink aggregate according to whether its physical members terminate on one FortiSwitch or a supported MCLAG peer group, validating split behavior separately. Its confirming test is to inspect FortiGate aggregate partner state, active-versus-standby paths and FortiSwitch management continuity before and after a staged link change.

B:

This action and check address the distinct objective “Separate FortiGate routing ownership from FortiSwitch standalone routing” instead of the stated acceptance requirement. The matching action is to configure the FortiGate FortiLink aggregate according to whether its physical members terminate on one FortiSwitch or a supported MCLAG peer group, validating split behavior separately. Its confirming test is to inspect FortiGate aggregate partner state, active-versus-standby paths and FortiSwitch management continuity before and after a staged link change.

D:

This action and check address the distinct objective “Verify optic type, distance and speed on FortiSwitch uplinks” instead of the stated acceptance requirement. The matching action is to configure the FortiGate FortiLink aggregate according to whether its physical members terminate on one FortiSwitch or a supported MCLAG peer group, validating split behavior separately. Its confirming test is to inspect FortiGate aggregate partner state, active-versus-standby paths and FortiSwitch management continuity before and after a staged link change.

Question 141

A healthcare campus deploys two distribution FortiSwitches as a redundant managed MCLAG peer pair. What is the strongest initial engineering response to the described FortiSwitch 7.6 network scenario?

  1. Install only the documented next-hop and prefix routes when a standalone FortiSwitch must reach an adjacent router, and validate reachability in both directions.
  2. For a FortiLink-managed deployment, keep the agreed inter-VLAN security and gateway routing on the FortiGate unless an explicitly supported alternative routing topology is designed.
  3. For a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service.
  4. Verify the active FortiLink path and any supported standby or ring links under realistic single-cable failure rather than treating physical carrier on all ports as proof of redundancy.

Explanation

Correct Answer

C:

For a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. This resolves the issue because multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity. To verify, test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

Incorrect Answers

A:

This option addresses the distinct objective “Use explicit static routes for a simple isolated standalone edge”, not the immediate requirement. A route determines the outgoing next hop for IP forwarding, but a one-way static route without return reachability cannot establish a usable bidirectional session. For the stated case, multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

B:

This option addresses the distinct objective “Separate FortiGate routing ownership from FortiSwitch standalone routing”, not the immediate requirement. FortiGate-managed VLAN interfaces can apply firewall and routing policy centrally; duplicating the gateway on a downstream switch can create asymmetric traffic. For the stated case, multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

D:

This option addresses the distinct objective “Test stack resilience with one link failed, not only green LEDs”, not the immediate requirement. A backup path may be blocked by split-interface design or depend on the same failure domain; observed green port LEDs do not establish control failover. For the stated case, multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

Question 142

A healthcare campus deploys two distribution FortiSwitches as a redundant managed MCLAG peer pair. What underlying forwarding, control-plane or operational behavior makes the correct solution work?

  1. Strict-priority queues can protect latency but can also starve lower-priority classes if an attacker or bulk process can enter them.
  2. Multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.
  3. A backup path may be blocked by split-interface design or depend on the same failure domain; observed green port LEDs do not establish control failover.
  4. A valid STP blocked state is a safety measure while loss of light or interface errors is a distinct physical failure with different remediation.

Explanation

Correct Answer

B:

Multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity. It supports this action: For a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. To confirm, test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

Incorrect Answers

A:

That statement explains the distinct objective “Classify emergency voice without starving ordinary traffic” rather than the cause in this case. The deciding mechanism here is that multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

C:

That statement explains the distinct objective “Test stack resilience with one link failed, not only green LEDs” rather than the cause in this case. The deciding mechanism here is that multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

D:

That statement explains the distinct objective “Differentiate STP blocking from an actual port malfunction” rather than the cause in this case. The deciding mechanism here is that multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

Question 143

A healthcare campus deploys two distribution FortiSwitches as a redundant managed MCLAG peer pair. Which specific test result most convincingly demonstrates the intended wired-network behavior?

  1. Record timestamps and affected ports, isolate a suspected rogue connection in staging and confirm topology-change counters stabilize.
  2. Validate DHCP on the guest segment and test that a guest reaches approved Internet services but not internal switch management or payroll hosts.
  3. Disconnect one documented ISL at a time in a lab and record authorization state, control recovery, upstream reachability and endpoint session effects.
  4. Test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

Explanation

Correct Answer

D:

Test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable. This is the relevant test because multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

Incorrect Answers

A:

This check would help evaluate the distinct objective “Investigate topology-change counters before suppressing STP”, but not the required result. For this case, test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

B:

This check would help evaluate the distinct objective “Use isolated guest segments rather than native VLAN sprawl”, but not the required result. For this case, test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

C:

This check would help evaluate the distinct objective “Test stack resilience with one link failed, not only green LEDs”, but not the required result. For this case, test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

Question 144

A healthcare campus deploys two distribution FortiSwitches as a redundant managed MCLAG peer pair. The unreviewed plan is: “Activate both FortiGate aggregate links before forming the MCLAG ICL and ignore inconsistent peer discovery because the switches look identical.” What failure should the change owner expect?

  1. The unauthorized VLAN can leak across the campus and create an accidental bridge into departments whose traffic must remain separate.
  2. A formerly authorized downstream switch disappears from the FortiGate inventory because its control or inter-switch path was repurposed.
  3. A topology loop can disturb control and client forwarding and cause devices to disappear from central switch management.
  4. Dual-homed links can flap or forward inconsistently, causing client outages and unstable FortiLink management sessions.

Explanation

Correct Answer

D:

Dual-homed links can flap or forward inconsistently, causing client outages and unstable FortiLink management sessions. The shortcut creates this risk because multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

Incorrect Answers

A:

That outcome concerns the distinct objective “Assign FortiSwitch access and trunk VLANs deliberately”; it is not the most direct consequence of this shortcut. The relevant consequence is that dual-homed links can flap or forward inconsistently, causing client outages and unstable FortiLink management sessions.

B:

That outcome concerns the distinct objective “Prevent unsupported port allocation in a multi-switch stack”; it is not the most direct consequence of this shortcut. The relevant consequence is that dual-homed links can flap or forward inconsistently, causing client outages and unstable FortiLink management sessions.

C:

That outcome concerns the distinct objective “Plan explicit FortiSwitch stack inter-switch link topology”; it is not the most direct consequence of this shortcut. The relevant consequence is that dual-homed links can flap or forward inconsistently, causing client outages and unstable FortiLink management sessions.

Question 145

A healthcare campus deploys two distribution FortiSwitches as a redundant managed MCLAG peer pair. Which change and test should be carried out together before the issue is considered resolved?

  1. Build a supported FortiSwitch inter-switch topology with documented ISL ports and FortiGate management reachability, taking care not to put the FortiGate itself in an accidental ring. Acceptance evidence: Compare the supported topology diagram with actual LLDP neighbors and verify each switch appears authorized and manageable after a controlled single-link failure.
  2. For a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. Acceptance evidence: Test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.
  3. Apply appropriate FortiSwitch edge-port BPDU protection and loop prevention to user-facing ports while reserving legitimate trunk connections for approved switch peers. Acceptance evidence: Attach a safe simulated downstream mini-switch and verify port protection responds as designed while approved single-device endpoints remain connected.
  4. Reserve suitable priority treatment for verified voice flows and provide reasonable service for all other queues, testing the total uplink under peak congestion. Acceptance evidence: Replay known voice plus background traffic, inspect per-queue drops and confirm critical voice latency and ordinary application throughput both stay acceptable.

Explanation

Correct Answer

B:

For a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. Acceptance evidence: Test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable. This pairing is justified because multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

Incorrect Answers

A:

This action and check address the distinct objective “Plan explicit FortiSwitch stack inter-switch link topology” instead of the stated acceptance requirement. The matching action is to for a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. Its confirming test is to test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

C:

This action and check address the distinct objective “Use edge port protection against unexpected bridges” instead of the stated acceptance requirement. The matching action is to for a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. Its confirming test is to test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

D:

This action and check address the distinct objective “Classify emergency voice without starving ordinary traffic” instead of the stated acceptance requirement. The matching action is to for a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. Its confirming test is to test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

Question 146

A transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. Which action most directly meets the topology or service requirement while preserving the approved network design?

  1. Build a supported FortiSwitch inter-switch topology with documented ISL ports and FortiGate management reachability, taking care not to put the FortiGate itself in an accidental ring.
  2. For a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service.
  3. Configure the FortiGate FortiLink aggregate according to whether its physical members terminate on one FortiSwitch or a supported MCLAG peer group, validating split behavior separately.
  4. Identify which physical switch interfaces are dedicated to FortiLink or inter-switch connections and reserve compatible port speeds and optics before assigning user trunks.

Explanation

Correct Answer

B:

The situation is that a transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. For a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. This resolves the issue because multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity. To verify, test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

Incorrect Answers

A:

This option addresses the distinct objective “Plan explicit FortiSwitch stack inter-switch link topology”, not the immediate requirement. FortiLink-managed downstream switches communicate through designated discovery and inter-switch links; loops or wrong ISL roles can block control communication. For the stated case, multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

C:

This option addresses the distinct objective “Choose LACP and aggregate mode for the actual FortiLink topology”, not the immediate requirement. An aggregate connected to unrelated peers is not automatically one consistent LACP partner and FortiLink split mode can intentionally leave only one path active. For the stated case, multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

D:

This option addresses the distinct objective “Prevent unsupported port allocation in a multi-switch stack”, not the immediate requirement. A physical connector advertised as an uplink may have a platform-dependent role or supported speed; connecting it as ordinary data can break stack discovery. For the stated case, multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

Question 147

A transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. Which networking principle best explains why the appropriate approach would solve this problem?

  1. VLAN tagging limits Layer 2 broadcast reach but does not by itself authorize Internet access or block routing between permitted VLAN gateways.
  2. Multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.
  3. LACP groups physical members into one logical port only when negotiation and membership agree; a live physical link can remain logically excluded.
  4. An aggregate connected to unrelated peers is not automatically one consistent LACP partner and FortiLink split mode can intentionally leave only one path active.

Explanation

Correct Answer

B:

The situation is that a transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. Multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity. It supports this action: For a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. To confirm, test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

Incorrect Answers

A:

That statement explains the distinct objective “Use isolated guest segments rather than native VLAN sprawl” rather than the cause in this case. The deciding mechanism here is that multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

C:

That statement explains the distinct objective “Design LACP aggregates with compatible forwarding and partner state” rather than the cause in this case. The deciding mechanism here is that multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

D:

That statement explains the distinct objective “Choose LACP and aggregate mode for the actual FortiLink topology” rather than the cause in this case. The deciding mechanism here is that multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

Question 148

A transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. Which controlled diagnostic or acceptance observation would best prove this solution has worked?

  1. Test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.
  2. Validate DHCP on the guest segment and test that a guest reaches approved Internet services but not internal switch management or payroll hosts.
  3. Capture before-and-after LLDP TLVs, check the current authentication session and phone VLAN, and confirm voice traffic still follows approved policy.
  4. Compare the supported topology diagram with actual LLDP neighbors and verify each switch appears authorized and manageable after a controlled single-link failure.

Explanation

Correct Answer

A:

The situation is that a transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. Test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable. This is the relevant test because multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

Incorrect Answers

B:

The situation is that a transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. This check would help evaluate the distinct objective “Use isolated guest segments rather than native VLAN sprawl”, but not the required result. For this case, test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

C:

This check would help evaluate the distinct objective “Audit LLDP and LLDP-MED behavior after profile changes”, but not the required result. For this case, test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

D:

This check would help evaluate the distinct objective “Plan explicit FortiSwitch stack inter-switch link topology”, but not the required result. For this case, test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

Question 149

A transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. The team proposes this shortcut: “Activate both FortiGate aggregate links before forming the MCLAG ICL and ignore inconsistent peer discovery because the switches look identical.” Which failure would most directly follow?

  1. A minor media failure can isolate an entire wiring-closet stack although monitoring previously labeled it redundant.
  2. Dual-homed links can flap or forward inconsistently, causing client outages and unstable FortiLink management sessions.
  3. Internal or guest subnet routes can escape into unintended routing domains and produce unpredictable transit or security exposure.
  4. Selected members show up while voice or monitoring services intermittently disappear or leak into unintended tagged networks.

Explanation

Correct Answer

B:

The situation is that a transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. Dual-homed links can flap or forward inconsistently, causing client outages and unstable FortiLink management sessions. The shortcut creates this risk because multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

Incorrect Answers

A:

That outcome concerns the distinct objective “Test stack resilience with one link failed, not only green LEDs”; it is not the most direct consequence of this shortcut. The relevant consequence is that dual-homed links can flap or forward inconsistently, causing client outages and unstable FortiLink management sessions.

C:

That outcome concerns the distinct objective “Control routing advertisements to prevent leakage”; it is not the most direct consequence of this shortcut. The relevant consequence is that dual-homed links can flap or forward inconsistently, causing client outages and unstable FortiLink management sessions.

D:

That outcome concerns the distinct objective “Prevent VLAN truncation across aggregated inter-switch links”; it is not the most direct consequence of this shortcut. The relevant consequence is that dual-homed links can flap or forward inconsistently, causing client outages and unstable FortiLink management sessions.

Question 150

A transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. What implementation and acceptance-evidence pair best addresses the network requirement?

  1. Identify which physical switch interfaces are dedicated to FortiLink or inter-switch connections and reserve compatible port speeds and optics before assigning user trunks. Acceptance evidence: Check platform guidance, each port's operational role and LLDP partner, then verify managed switch inventory remains stable after activating user ports.
  2. Build a supported FortiSwitch inter-switch topology with documented ISL ports and FortiGate management reachability, taking care not to put the FortiGate itself in an accidental ring. Acceptance evidence: Compare the supported topology diagram with actual LLDP neighbors and verify each switch appears authorized and manageable after a controlled single-link failure.
  3. In standalone mode, configure the intended VLAN interface and IP subnet for routed client networks on a FortiSwitch model and release supporting the required Layer 3 features. Acceptance evidence: Verify a client can ARP the planned gateway and reach one approved routed subnet while a deliberately unauthorized destination remains filtered.
  4. For a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. Acceptance evidence: Test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

Explanation

Correct Answer

D:

The situation is that a transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. For a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. Acceptance evidence: Test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable. This pairing is justified because multi-chassis aggregation relies on peer coordination and redundant inter-chassis connectivity; simply attaching cables does not create safe shared LACP identity.

Incorrect Answers

A:

This action and check address the distinct objective “Prevent unsupported port allocation in a multi-switch stack” instead of the stated acceptance requirement. The matching action is to for a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. Its confirming test is to test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

B:

The situation is that a transportation authority migrates from an active-standby FortiLink split design to a supported active MCLAG topology. This action and check address the distinct objective “Plan explicit FortiSwitch stack inter-switch link topology” instead of the stated acceptance requirement. The matching action is to for a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. Its confirming test is to test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

C:

This action and check address the distinct objective “Establish a correct standalone FortiSwitch L3 gateway interface” instead of the stated acceptance requirement. The matching action is to for a supported FortiSwitch MCLAG design, establish adequate ICL links, appropriate peer settings and the documented FortiLink split-mode transition before putting both uplinks into service. Its confirming test is to test FortiLink aggregate state and MCLAG peer status, fail a controlled inter-chassis member and verify clients and switch management remain reachable.

Fortinet NSE 5 - FortiSwitch 7.6 Administrator (NSE5_FSW_AD-7.6) Practice Tests